This project was one, if not the largest reconstruction project we have completed on a travel trailer. The project is so large that we have 10 percent of the documented photos in this gallery. There was a total of 3 front frame and panel sections replaced, 2 roof frame/ panels, 8 linear feet of left and right wall frame/ panels replaced, 2 rear frame/ panel sections replaced, 4 linear feet of left rear wall frame/ panel reaplaced, new flooring, and much, much more. Take a look. This trailer sold in less than 24 hours of completion for much more than we expected. Although we are proud of this, no revenue was generated from the repair of this trailer. The purpose of completing such an infeasible project was to show the public our capabilities and also to keep our staff employed in the slow winter months.